Skip to content

fix(security): distrust emSign root in tiles image - #105

Merged
John McCall (lowlydba) merged 3 commits into
mainfrom
lowlydba-104-emsign-ca-remediation
Oct 22, 2026
Merged

John McCall (lowlydba) merged 3 commits into
mainfrom
lowlydba-104-emsign-ca-remediation

fix(docker): distrust emSign ECC Root CA - G3

b7c1bc1
Select commit
Loading
Failed to load commit list.
DCO-2 / DCO succeeded Oct 22, 2026 in 1s

Check passed!

All commits are signed off, the check passed.

Summary


Sha Message Pass or fail reason
🟢 0cda877 fix(docker): move base image to amazoncorretto:25-... Skipped: sign-off not required for members
🟢 3e1a010 fix(docker): upgrade ca-certificates at build time Skipped: sign-off not required for members
🟢 b7c1bc1 fix(docker): distrust emSign ECC Root CA - G3 Skipped: sign-off not required for members